Our

Crafting the Future, One Project at a Time.

Handled Assignments

Maintenance & Equip Installation

Civil Work

Proposal for upgrading the drains and drainage system @ Pulau Pangkor

M&E Installation

Proposal for the installation of the Wenger hammer mill system, PLC control system for the extruder, wiring work for machines, and control panels for fabricating inverters @ Dinding Soya Multifeed

M&E Installation

Installation work for control panels for the 132kW Siemens inverter bucket elevator system, and the supply of 2 sets of Siemens-branded motors with Flender gearboxes, as well as a 5.5kW auxiliary drive motor @ Malayan Flour Mill

Civil Work

Proposal for the repair work of foundation settlement at the PMU 500kV switchyard in Janamanjung, asset maintenance bridge, Transmission Division of TNB @ TNB JanaManjung

Dismantling and replacing the expansion joints at the mill for 4 units, ensuring proper alignment and functionality. This includes the removal of old, worn-out expansion joints, and the installation of new joints @ Tanjung Bin Power Plant

Maintenance & Equip Installation

Renewing worn-out parts of fabric expansion joints and replacing them with new ones for 3 units. This includes removing the damaged or degraded fabric expansion joints, inspecting, and installing durable replacements to restore functionality, prevent leaks, and ensure the efficient operation of the system @ Jimah EDRA Power Plant

Electrical & Construction

Renovation of office. The work involves as well as dismantling lighting fixtures, safety equipment, ceiling, and wall frames, along with related wiring, as part of the site preparation. The work includes supplying materials and installing cement and flooring tiles. It also involves supplying materials and fully installing a suspended ceiling with frames. Additionally, it includes supplying materials and fully installing two gypsum board walls, as well as supplying and applying paint on all the walls @ TNB Janamanjung

Construction

The work involves extending the roof and floor projections for the hazardous goods store for the BOPM section @ TNB Janamanjung

Other Completed Jobs & More..

Proposal for the supply & installation of NI LabVIEW software for PLC program development with auto-save changes (Allen Bradley)
@ TNB Janamanjung

Installing an additional lighting system at the tripper floor of the GF2 Coal Stockyard to improve visibility and safety. Includes the supply and installation of lighting fixtures & wiring @ TNB Janamanjung

Installing an automated racking control system, including control panels, sensors, and software integration to optimize storage and retrieval processes
@ Nippon Pigment

Troubleshooting to identify and resolve issues with faulty components and circuits, including testing, diagnosing, and repairing or replacing defective parts to restore proper functionality
@ TNB Janamanjung

The project involves servicing and repairing the HVAC systems for CCB, ECP, and PJFF, including routine maintenance, troubleshooting, and replacement of any faulty components @ TNB Janamanjung

Renovation work at the administration building, including ceiling replacement, refurbishing of Formica tables, and painting work @ TNB Janamanjung